Projects: Gallery
Mailboxes
There are 3 main styles to choose from; Archtop, Eyebrow and Flattop. After choosing the style, you have multiple options for materials and features to customize it to your liking.

Flattop with Leuders stone and address block

Flattop with architectural insert

Flattop with Austin White stone and address block

Double Flattop to match neighborhood style

Archtop with tuff body steel insert

Flattop with Oklahoma dark stone and address block

Flattop with Chocolate Swirl stone, address block and tuff body steel insert

Flattop with address block






Archtop with oversized architectural insert


Flattop with Cast stone cap and address block. Large sized insert.


Flattop with Leuders stone and address block

Flattop with architectural insert

Flattop with Austin White stone and address block

Double Flattop to match neighborhood style

Archtop with tuff body steel insert

Flattop with Oklahoma dark stone and address block

Flattop with Chocolate Swirl stone, address block and tuff body steel insert

Flattop with address block






Archtop with oversized architectural insert


Flattop with Cast stone cap and address block. Large sized insert.

Screening Walls aka Brick Fencing

Screening Wall Completed. Brick was cleaned off and saved since this brick is no longer available. New bricks were hand stained to match and blended in.

Screening wall and Stone column being rebuilt

Stone column and brick fence damaged from vehicle impact.

New 8' tall screening wall and columns


8' tall wall demolished by vehicle.

Bold column being crushed by the adjacent panels. We remove the wooden fencing and rebuild the column allowing for movement. Then seal the joints using matching caulk and sand to the mortar color.

Brick fencing removed and prepared for installation of new bricks. Chain link temporary fencing is used when homes have pets, pools or if panels cannot be rebuilt in the same day.

Panel damaged during storms. We work with insurance companies and management companies to get the work completed ASAP

Panel damaged from vehicle impact. We work with insurance companies and management companies to get the work completed ASAP

Panel damaged during storms.

Panel's footing has heaved so much that it is causing the panel to collapse. Footing and panel will be demolished and rebuilt.

Panel and footing being rebuilt. Temporary fencing in place to protect home from foot traffic.

New concrete footing being poured using 3.000 psi concrete and rebar support.

Fence panel and footing completed, time for clean up.

Panels and footings completed and washed. Yard is cleaned up so nothing is left behind for the homeowner.

This 35 panels was destroyed during a Tornado. Photo is of completed project, waiting for final washing.

Fence panels and column rebuilt to match 35 year old wall.

Vehicle crash. Debris was cleaned up within 24 hours and temporary fencing installed.

Project staging.

Final product of a vehicle impact. New bricks looks "new" but with a little age will blend perfectly.

Tornado storm damages

Vehicle crash

Vehicle crash cleaned up and temporary fencing installed while we waited for new matching brick to arrive.

Project staging.
Brick Repairs and Replacement

Before repairs.

After replacing broken blocks with matching and blending mortar to a reasonable match.


Original condition of archway leg. Mortar is cracked and missing.

Mortar was ground out and replaced with matching.

40 year old flower bed crumbling and falling apart.

40 year old flower bed repaired

40 year old flower bed crumbling and falling apart.

40 year old flower bed crumbling and falling apart.

Before repairs.

After replacing broken blocks with matching and blending mortar to a reasonable match.


Original condition of archway leg. Mortar is cracked and missing.

Mortar was ground out and replaced with matching.

40 year old flower bed crumbling and falling apart.

40 year old flower bed repaired

40 year old flower bed crumbling and falling apart.

40 year old flower bed crumbling and falling apart.

Before repairs.

After replacing broken blocks with matching and blending mortar to a reasonable match.


Original condition of archway leg. Mortar is cracked and missing.

Mortar was ground out and replaced with matching.

40 year old flower bed crumbling and falling apart.

40 year old flower bed repaired

40 year old flower bed crumbling and falling apart.

40 year old flower bed crumbling and falling apart.

Before repairs.

After replacing broken blocks with matching and blending mortar to a reasonable match.


Original condition of archway leg. Mortar is cracked and missing.

Mortar was ground out and replaced with matching.

40 year old flower bed crumbling and falling apart.